Angling Road Culvert Replacement

Closed March 15, 2022, 03:00 PM

  • Reference number91300-006.0
  • StatusAwarded
  • SummaryThe scope of work for this project shall consist of the removing and replacing of two (2) culverts along Angling Road. The proposed culverts consist of a 48-inch diameter culvert and an 18-foot by 5-foot concrete box culvert.
  • Winning entity
    Balkema Excavating, Inc.
    269-345-5289
    tbalkema@balkemaexc.com
  • Value$814,500.90
  • Date awardedApril 22, 2022

91300-006.0 Bid Tabulation(PDF, 190KB)

91300-006.0 Bid Document(PDF, 8MB)

91300-006.0 Plans(PDF, 6MB)

91300-006.0 Distribution List(PDF, 39KB)

The scope of work for this project shall consist of the removing and replacing of two (2) culverts along Angling Road.  The proposed culverts consist of a 48-inch diameter culvert and an 18-foot by 5-foot concrete box culvert.  Included in the culvert replacement work is maintaining traffic via a detour route, culvert removal, excavation, bypassing, proposed structure placement, backfill, ditching, storm water improvements, water main relocation, pavement restoration, and slope restoration.  In addition, Angling Road shall be milled and resurfaced from Merryview Drive to Oakland Drive.

All necessary traffic control, labor, materials, tools, equipment, and other items incidental to the work being performed shall be included in the Contractor’s unit price for this contract. Such items will not be bid or paid for separately but shall be included in the overall unit price.

The  bidder  shall  furnish  all  labor,  supervision,  supplies,  tools,  equipment,  and  other means necessary or proper for performing and completing the work.  The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo. Drainage structure covers shall be salvaged and reused if in usable condition; otherwise, they shall be replaced. Where needed, all traffic control used for such operations as defined by the MMUTCD will be the responsibility of the bidder.

The bidder shall have all work completed by September 30, 2022.