Central Pump Station Office HVAC System

Closed July 10, 2025, 04:30 PM

  • Reference number92567-007.0
  • StatusAwarded
  • SummaryIt is the intent of these plans and specifications to seek bids for entering into a contract for all direction, management, labor, materials, tools and equipment necessary to perform the Central Pump Station Office HVAC System as specified herein.
  • Winning entity
    RW Lapine Inc.
  • Value$29,950.00
  • Date awardedJuly 18, 2025

92567-007.0-Bid Tabulation(PDF, 11KB)

92567-007.0-Addendum 1(PDF, 212KB)

92567-007.0-bid document(PDF, 334KB)

215 W Stockbridge Central Pump Station Office HVAC System Specifications:

IT Server Room

• Provide and install a 3-Ton P-Series Mitsubishi Cooling Only System for the server room.

• Provide and install a 3-Ton P-Series Wall mount evaporator serving the server room.

• Provide and install a 3-Ton P-Series Mitsubishi Outdoor unit on the wall outside in the fenced area.

• Provide and install a wired remote for control of the server room.

• Provide and install a condensate pump below the wall mount unit to pump condensate to the existing condensate drain line above ceiling.

• Provide and install a wall mount bracket for the new outdoor unit.

• Provide and install line hide to hide the new line set down the outside wall.

• Provide and install line volt electrical for units and condensate removal systems.

• Perform start-up and checkout of all elements.

• Warranty all elements provided for one year after installation.

Office Room

• Provide and install a 3-Ton P- Series Mitsubishi Heat Pump System for the control room.

• Provide and install a 3-Ton P-Series Mitsubishi ceiling cassette evaporator.

• Provide and install a 3-Ton P-Series Mitsubishi Heat Pump Outdoor unit on the wall outside in the fenced area.

• Provide and install a wired remote for control of the control room.

• Provide and install condensate pump as needed for condensate removal to the existing condensate drain.

• Provide and install line hide to hide the new line set down the outside wall.

• Provide and install line volt electrical for units and condensate removal systems.

• Perform start-up and checkout of all elements.

• Warranty all elements provided for one year after installation.