Contract 77-A John St, Newton Ct, & Fellows Ave Utility Replacement

Closed May 22, 2025, 03:30 PM

  • Reference number91359-004.0
  • StatusOpen
  • SummaryIt is the intent of these plans and specifications to provide for a general contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for the Contract 77-A John St, Newton Ct, & Fellows Ave Utility Replacement described in the specifications and bid document.

91359-004.0-bid tabulation(PDF, 158KB)

91359-004.0-Addendum 5(PDF, 397KB)

91359-004.0-Addendum 4(PDF, 393KB)

91359-004.0-Addendum 3(PDF, 3MB)

91359-004.0-Addendum 2(PDF, 150KB)

91359-004.0-Addendum 1(PDF, 7MB)

91359-004.0-Pre-bid Meeting Attendance(PDF, 19KB)

91359-004.0-bid document(PDF, 19MB)

91359-004.0-distribution list(PDF, 70KB)

91359-004.0-Plans(PDF, 17MB)

91359-004.0-Specifications(PDF, 3MB)

SCOPE OF WORK

The scope of work for this project shall consist of Replacement of existing public Water & Sewer infrastructure within Newton and Fellows Aves. Abandonment of the sewer siphon on John St with a gravity sewer. The contract and work shall be carried out in conformance with the MDOT Standard Specifications for Construction, Standard Details of the City of Kalamazoo and Ordinances of the City of Kalamazoo in effect on the date of invitation for bids.

The bidder shall furnish all labor, supervision, supplies, tools, equipment and other means necessary or proper for performing and completing the work. The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo. Where needed, all traffic control used for such operations as defined by the MMUTCD will be the responsibility of the bidder.

The bidder shall have all work completed by November 13, 2026.