Miller Road (Emerald to Sprinkle)

Closed March 01, 2022, 03:30 PM

  • Reference number91395-001.0
  • StatusAwarded
  • SummaryThe scope of work for this project shall consist of the milling and resurfacing of approximately 1.0 mile on Miller Road from Emerald Drive to Sprinkle Road. This consists of milling and resurfacing to a depth of 3” as well as other related items described in project documents.
  • Winning entity
    Reith-Riley Construction Co., Inc.
    269-343-4525
  • Value$719,035.79
  • Date awardedApril 27, 2022

91395-001.0 Bid Tabulation(PDF, 226KB)

91395-001.0 Bid Document(PDF, 6MB)

91395-001.0 Plans(PDF, 4MB)

91395-001.0 Distribution List(PDF, 35KB)

The scope of work for this project shall consist of the milling and resurfacing of approximately 1.0 mile on Miller Road from Emerald Drive to Sprinkle Road. This consists of milling and resurfacing to a depth of 3” as well as other related items described in project documents. The P.O.B. shall be at the existing HMA joint on Miller Road at the intersection with Emerald Drive as directed by the Engineer. The P.O.E. shall be at the existing HMA joint on Miller Road prior to and adjacent to the intersection with Sprinkle Road as directed by the Engineer.

All necessary traffic control, labor, materials, tools, equipment, and other items incidental to the work being performed shall be included in the Contractor’s unit price for this contract. Such items will not be bid or paid for separately but shall be included in the overall unit price.

The bidder shall furnish all labor, supervision, supplies, tools, equipment, and other means necessary or proper for performing and completing the work. The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo. Drainage structure covers shall be salvaged and reused if in usable condition; otherwise, they shall be replaced. Where needed, all traffic control used for such operations as defined by the MMUTCD will be the responsibility of the bidder.

The bidder shall have all work completed by August 1, 2022.