Concrete, Flatwork - Crosstown Parkway Remodel

Closing date September 23, 2025, 11:00 AM

  • Reference number91430-002.0
  • StatusOpen
  • SummaryIt is the intent of these specifications and drawings/plans to provide for a contractor who shall provide all labor, materials, tools, equipment, and services necessary to perform in a professional manner the Concrete, Flatwork for the Crosstown Parkway Remodel as described in the specifications and bid document.

91430-002.0-Bid Document(PDF, 59MB)

91430-002.0-Bid Schedule(PDF, 704KB)

91430-002.0-Distribution List(PDF, 80KB)

91430-002.0-Drawings(PDF, 49MB)

91430-002.0-Scope(PDF, 149KB)

91430-002.0-Specifications(PDF, 9MB)

NON-MANDATORY WALKTHROUGH/SITE INSPECTION September 15, 2025, 10:00 a.m. to 12:00 p.m. Location: 150 E. Crosstown Parkway (CPED Side Only)

INTENT

It is the intent of these specifications and drawings/plans to provide for a contractor who shall provide all labor, materials, tools, equipment, and services necessary to perform in a professional manner the Concrete, Flatwork for the Crosstown Parkway Remodel as described in the specifications and bid document.

SCOPE OF WORK

The scope of work involves work for Concrete, Flatwork for the Crosstown Parkway Remodel as stated in the attached scope, specifications and drawings.