Treatment Plan NO 25 Electrical Reliability Project

Closing date July 01, 2026, 03:00 PM

  • Reference number91359-007.0
  • StatusOpen
  • SummaryTHE PROJECT LOCATION FOR PUMP STATION 25 IS 7275 EAST H AVENUE, KALAMAZOO,MI 49048. THE WORK AT PUMP STATION 25 CONSISTS OF DEMOLISHING EXISTING ELECTRICAL EQUIPMENT AND PROVIDING AND INSTALLING NEW ELECTRICAL EQUIPMENT AND APPURTENANCES IN A NEW BUILDING, AS WELL AS A NEW GENERATOR, SITE WORK,
    PAVING AND NEW CONDUIT AND DUCTWORK FROM PUMP STATION 25 TO THE EXISTING NINE WELLS. THE WORK ALSO INCL

 

THE PROJECT LOCATION FOR PUMP STATION 25 IS 7275 EAST H AVENUE, KALAMAZOO, MI 49048.  THE WORK AT PUMP STATION 25 CONSISTS OF DEMOLISHING EXISTING ELECTRICAL EQUIPMENT AND PROVIDING AND INSTALLING NEW ELECTRICAL EQUIPMENT AND APPURTENANCES IN A NEW BUILDING, AS WELL AS A NEW GENERATOR, SITE WORK, PAVING AND NEW CONDUIT AND DUCTWORK FROM PUMP STATION 25 TO THE EXISTING NINE WELLS. THE WORK ALSO INCLUDES DEMOLISHING PUMPS 1 AND 3 ALONG WITH APPURTENANCES AND PROVIDING AND INSTALLING NEW REPLACEMENT PUMPS, EQUIPMENT, AND MINOR PIPE AND VALVE MODIFICATIONS.  THIS WORK ALSO INCLUDES NEW AUTOMATIC GAS CONTROL VALVES AND CONTROLLERS ON THE CHLORINE GAS SYSTEM.

MANDATORY PRE-BID MEETING/SITE INSPECTION – June 17, 2026 @ 9:00 a.m.

Location: 7275 East H Avenue, Kalamazoo MI 49048